Yamazumi 3D

The Yamazumi 3D demo aims to eliminate waste or aid workload balancing by displaying time cycles via a stacked bar chart. Yamazumi is a Japanese word which means huge mound, heap or pile.
Demo instructions
Hover tasks to display tools which allow you to increase or decrease task time. Drag and drop elements to different stacks in order to balance the workload.
Yamazumi 3D

Made with JointJS+

Only available with the JointJS+ commercial license in the apps/ directory of your package. Don't have a license yet? Start a trial and use the source code of all our demos for free, with no strings attached, for 30 days.

Made with JointJS

Available in the JointJS open-source library which helps developers create simple visual applications in less time.

The role of JointJS in building a Yamazumi 3D Chart

JointJS, a powerful diagramming library, helps developers and companies of any size build advanced visual applications and No-Code/Low-Code tools. It provides a wealth of ready-made demos and a wide range of prebuilt features that make creating applications such as Yamazumi 3D Chart a breeze.

We equip developers with all the plugins they need to save time and focus their energy elsewhere such as StackLayoutView, StackLayout, CommandManager, and Toolbar.

New to this topic? Learn more about Yamazumi Charts 👇

What is a Yamazumi Chart?

To explain the meaning of the Yamazumi charts, we'll have to visit the beautiful country of Japan – that's where this technique of eliminating waste in a production process comes from. The Japanese word Yamazumi literally means to stack up which probably comes as no surprise after seeing the demo above. The goal of Yamazumi Charts is to eliminate non-value added activities in a certain process by visually presenting the work content and shedding light on what activities add value and what don't.

4 key steps to create a Yamazumi Chart

Peter Drucker once said: "If you can't measure it, you can't improve it." It was more about marketing than process optimization, but the same quote could be appropriately applied here. Creating a Yamazumi Chart and evaluating which activities are wasteful and which are not begins with identifying those activities, measuring them, and improving them. Let's briefly go through each of the steps.

1. Calculating takt time

Let's borrow the Kanbanize explanation that nicely explains the meaning of this term. “Takt time is the rate at which you need to complete a product to meet customer demand. For example, if you receive a new product order every 4 hours, your team needs to finish a product in 4 hours or less to meet demand.” The formula would look as follows: available work time / customer demand rate. For example, if the customers need 10 units a day and your shop has 700 working hours a day, the takt time is 70.

2. List the process step and cycle time

For each process step, indicate the cycle time, which is the time it takes to complete the activity from start to finish. At this point, your Yamazumi chart would already contain the takt time and processes and would look similar to the one below:

Yamazumi chart

3. Process analysis: Value added & value non-added

The next step is to identify value-added and non-value-added activities in the processes. The elimination of wasteful activities really starts at this point, as you will gain insight into which activities are not leading to the expected outcome.

4. Line balancing analysis

This strategy helps match the production rate to takt time. As Tulip puts it, “Line balancing is a production strategy that involves balancing operator and machine time to match the production rate to the takt time. For a given production line, if production time is exactly equal to takt time, then the line is perfectly balanced.” You can read more in their great article that explains more about this strategy.

The benefits of a Yamazumi chart

The benefits of this lean manufacturing strategy have already been mentioned above. At the core is the increased efficiency achieved by being able to change the process as the takt time changes and to gain visual insight into overloaded and underutilized operations.

Ready to take the next step?

Modern development is not about building everything from scratch. The JointJS team equips you with plenty of ready-to-use demo apps that can serve as a boilerplate and radically reduce your development time. Start a free 30-day JointJS+ trial, get the source code of the Yamazumi 3D demo application, and go from zero to a fully functional app in no time.

Speed up your development with a powerful library

Leverage a time-tested JavaScript diagramming library using the best of HTML5 and SVG to accelerate your development.